Get it verified.
Before it becomes
a problem.

Complete. From first inspection to final certificate.

What we inspect

Initial Detailed Inspection

Conducted before first use, this inspection verifies that all equipment meets the required standard for its classified location. Non-conformances are closed out before the installation is commissioned.

Periodic
Inspection

A scheduled inspection of in-service installations that confirms continued compliance and identifies deterioration or damage. Required at regular intervals under IEC 60079-17.

Pre-commissioning Inspection

Conducted immediately before handover or commissioning to confirm the installation is compliant and ready for operation.

Full written report. Findings, non-conformances, recommended remedial actions. Issued digitally.

IEC 60079-17 | NEC Article 500 | NFPA 70

Credentials

Founded Houston 1998 and Best Customer Service Award HazardexLive 2024

IECEx Service Facility (IECEx OD 314-4)

Assembly Certification (IEC TS 60079-46)

ISO 9001:2015

CompEx Official Training Provider

NEC and IEC capable

The work
that backs it up

Real projects.
Compliant outcomes.
On schedule.

Specify

FPSO Cable Project

Manage the procurement of Electrical Cable for a major FPSO Project.

Read more

Certify

Aerospace Compliance

Consistent hazardous-area competence across multiple sites supporting mission safety.

Read more

Supply + Certify

OEM Supply & Certification

Long-term hazardous-area compliance to meet client requirements

Read more

Related products

Hazardous area
classification

Helps define the boundaries before equipment is specified

Get a fast quote

Hazardous Area
Compliance Review

Get a fast quote

A structured review before third-party audit or certification

HazLoc and IECEx
Certification Support

Get a fast quote

From inspection to certificate

Book an inspection
today.

Critical. From start to finished.