
Get it verified.
Before it becomes
a problem.
Complete. From first inspection to final certificate.
What we inspect
Initial Detailed Inspection
Conducted before first use, this inspection verifies that all equipment meets the required standard for its classified location. Non-conformances are closed out before the installation is commissioned.
Periodic
Inspection
A scheduled inspection of in-service installations that confirms continued compliance and identifies deterioration or damage. Required at regular intervals under IEC 60079-17.
Pre-commissioning Inspection
Conducted immediately before handover or commissioning to confirm the installation is compliant and ready for operation.
Full written report. Findings, non-conformances, recommended remedial actions. Issued digitally.
IEC 60079-17 | NEC Article 500 | NFPA 70
Credentials
Founded Houston 1998 and Best Customer Service Award HazardexLive 2024
IECEx Service Facility (IECEx OD 314-4)
Assembly Certification (IEC TS 60079-46)
ISO 9001:2015
CompEx Official Training Provider
NEC and IEC capable
The work
that backs it up
Real projects.
Compliant outcomes.
On schedule.
Specify
FPSO Cable Project
Manage the procurement of Electrical Cable for a major FPSO Project.
Read more
Certify
Aerospace Compliance
Consistent hazardous-area competence across multiple sites supporting mission safety.
Read more
Supply + Certify
OEM Supply & Certification
Long-term hazardous-area compliance to meet client requirements
Read more
Related products
Hazardous area
classification
Helps define the boundaries before equipment is specified
Get a fast quote
Hazardous Area
Compliance Review
Get a fast quote
A structured review before third-party audit or certification
HazLoc and IECEx
Certification Support
Get a fast quote
From inspection to certificate